Customization: | Available |
---|---|
Industrial Use: | Packing Bag |
Transparency: | Translucent |
Still deciding? Get samples of US$ 3/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
ESD shielding bag with customized size
1.Production Details
APPLICATIONS of esd shielding bag:
Electrical Properties: |
Unit |
Typical Value |
Standards |
Surface resistivity Interior Exterior |
ohms |
<10e11 ohms 10e9-10e11 ohms 10e8-10e10 ohms |
ASTM D257 / ANSI/ESD STM11.11 |
Metalized Layer resistance |
Ohms/sq. |
<100 |
|
Metalized Layer transmission |
|
40%-0.4 |
|
Metal |
Ohms |
100 |
|
Static Shielding |
volts |
< 30 |
MIL-PRF-81705, EIA 541 |
Static Shielding |
nJ |
< 10 |
EOS/ESD S11.31 |
Static Decay |
5000-0V |
<0.05s |
MIL-PRF-81705, FTMS 101 MTH 4046 |
Charge Generation |
ELA541 Appendix C avg |
Quartz< 13nC/in2 Teflon<1313nc/in2 |
|
Capacitance probe |
ELA541 |
<10V |
|
Physical Properties: |
|
|
|
Tensile Strength |
Lbs./in |
>18 |
ASTM D 882 |
Tear Initiation |
Lbs./in |
>2.5 |
|
Puncture resistance |
p.s.l |
>100 |
|
Seam strength |
Lbs./in |
8 |
MIL-PRF-81705 |
MVTR barrier |
Gm/100min-2/24hrs |
<0.2 |
|
Oxygen barrier |
Cc/100min-2/24hrs |
<0.5 |
|
Heat Sealing Conditions Temperature Time Pressure |
F S p.s.l |
250-375 0.5-3.5 30-70 |
|
Thickness |
mils |
3 |
|
Outgassing |
|
Pass |
ASTM E595 |
Non-corrosive |
|
Pass |
FTMS 101 MTH 3005 |
Q1: How long you could prepare samples?
Ans:Normally 3days if we have the sample in hand. If customized one, about a week around.
Q2: How about batch order production?
Ans: normally 3-15days or so
Q3:Do you inspect the finished products?
Ans:Yes, We will do inspection according to ISO 9000 standard and ruled by our QC staff.
Q4: How do you ship the goods?
Ans: by sea, by air, by courier (UPS, DHL, Fedex, TNT etc.)
Q5: What advantage do you have?Ans:1. We have professional engineer to support you good solution for your products and design and draw the drawing for your checking.
2. Related responsible team to answer all your questions and follow up process for you and do update in time
3 Strict and standard process control according to Quality Management System.